
Director
Mr. Prem Krishna KC
Mr. K.C. is the Managing Director of the Company. He is well known hydropower professional in Nepal. He has more than 15 years of experience in planning, design and implementation of hydropower projects. Some of the projects he has worked in are:
- Khimti-2 Hydroelectric Project (48.8MW) – Detailed Engineering Design
- Langtang Khola Hydroelectric Project (20MW) – Detailed Engineering Design
- Super Lower Bagmati Hydropower Project (42MW) – Detailed Engineering Design
- Tiplyang Kaligandaki Hydropower Project (86MW) – Updated Feasibility Study
- Mai Beni Hydropower Project (9.5MW) – Detailed Engineering Design
- Siwa Khola Hydropower Project (10MW) – Detailed Engineering Design
- Upper Bheri Hydropower Project (325MW) – Feasibility Study
- Budhi Gandaki Hydroelectric Project (341MW) – Detailed Feasibility Study
- Middle Mewa Hydropower Project (73.5MW) – Detailed Engineering
- Midim-1 Hydropower Project (14MW) – Detailed Engineering
- Kaligandaki Kovan Hydropower Project (180MW) (Feasibility Study)
- Nagmati Water Impounding Dam Project (Feasibility Study)
- Mahadev Khola Water Impounding Dam Project (Feasibility Study)
- Tamor Mewa Hydroelectric Project (Feasibility Study)
- Melamchi Water Supply Project, Ambathan Site (Construction)
- Sunkoshi Marin Diversion Project (Detail Feasibility)
- Rolwaling Diversion Project (Detail Design)
- Upper Madi Hydropower Project (Feasibility Study)
- Dudhkoshi Storage Project (Feasibility Study)
He is graduate of Bachelor’s Degree in Civil Engineering (IoE, Nepal) and Master’s Degree in Hydropower Development (NTNU, Norway).