Director

Mr. Ram Hari Sharma

Mr. Sharma is well known engineering geologist in Nepal. He has more than 25 years of experience in planning, design and implementation of hydropower and tunnelling projects.

Some of the projects he has worked in are:

  • Bhirkate Road Tunnel – Review of Feasibility Study and Design
  • Lamabagar Road Tunnel – Review of Feasibility Study and Design
  • Geological Assessment of Tunnel Alternatives for the Kathmandu-Terai Fast Track Road Project
  • Khimti-2 Hydroelectric Project (Project Management and Implementation)
  • Langtang Khola Hydroelectric Project (Project Management and Implementation)
  • Super Lower Bagmati Hydropower Project (42MW) – Detailed Engineering Design
  • Tiplyang Kaligandaki Hydropower Project (86MW) – Updated Feasibility Study
  • Middle Mewa Hydropower Project (73.5MW) – Detailed Engineering
  • Mai Beni Hydropower Project (9.5MW) – Detailed Engineering Design
  • Siwa Khola Hydropower Project (10MW) – Detailed Engineering Design
  • Upper Bheri Hydropower Project (325MW) – Feasibility Study
  • Budhi Gandaki Hydroelectric Project (341MW) – Detailed Feasibility Study
  • Upper Karnali Hydropower Project (900MW) (Planning and Design)
  • Upper Marsyangdi Hydroelectric Project (600MW) (Planning and Design)
  • Kaligandaki Kovan Hydropower Project (180MW) (Feasibility Study)
  • Super Madi Hydroelectric Project (42MW) (Feasibility Study)
  • Middle Modi Hydroelectric Project (15MW) (Feasibility Study)
  • Modi Khola Hydroelectric Project (14MW) (Design and Construction)

He is graduate of Master’s Degree in Engineering Geology (TU, Nepal) and Master’s Degree in Tunnelling (EPFL, Switzerland).